My Vehicles ()
|

New 2026 Jeep Grand Cherokee Limited 4x4

View All Images Close
Click to Call Lease Specials
Discount Disclaimer
New 2026 Jeep Grand Cherokee Limited 4x4
Pricing Details
MSRP: $49,910
Doc Fee: + $175
Retail Bonus Cash: − $3,500
Bonus Cash: − $1,000
Sale Price: $45,585
Driveability / Automobility
Program:
− $1,000
First Responder Bonus
Consumer Cash:
− $500
Conditional
Final Price:
$44,085

Value your trade-in
Check Availability


Bayside Chrysler Dodge Jeep Ram

212-19 Northern Blvd Flushing, NY 11361

Call Us: (888) 707-4924

Vehicle Saved!

New 2026 Jeep Grand Cherokee Limited 4x4


Vehicle Details
  • Stock #: JG6162
  • VIN: 1C4RJHBR6TC278533
  • Mileage: 6
  • Engine: 2.0L HURRICANE 4 TURBO W/ESS
  • Exterior Color: Bright White Clear Coat
  • Interior Color: Global Black
  • Drive: 4x4
  • Transmission: Automatic

Dealer Comments

All pricing and details provided are believed to be accurate but we do not warrant or guarantee such accuracy. The prices shown above may vary from region to region as will incentives and are subject to change. New vehicles offered may be eligible for manufacturer incentives which may change at any time and are subject to incentive qualification criteria and requirements and which may be contingent upon manufacturer finance company approval. Manufacturer incentive data and vehicle features information is provided by third parties and believed to be accurate as of the time of publication. Vehicle information is based upon standard equipment and may vary from vehicle to vehicle. Please contact the dealership.


Installed Options
  • 2.0L Hurricane 4 Turbo Engine W/ESS
  • 3.70 Rear Axle Ratio
  • 4G LTE Wi-Fi Hot Spot
  • 50 State Emissions
  • 6 050 lbs GVWR
  • 8-Speed Automatic (8HP80) Transmission
  • Active Noise Control System
  • Apple CarPlay
  • Auxiliary Battery
  • Bright White Clearcoat
  • Capri Leatherette Seats
  • Connectivity - US/Canada
  • Disassociated Touchscreen Display
  • Dual-Pane Panoramic Sunroof
  • For Details Visit DriveUconnect.com
  • Front License Plate Bracket
  • Global Black
  • Global Telematics Box Module (TBM)
  • Gloss Black Exterior Mirrors
  • Google Android Auto
  • GPS Antenna Input
  • Heated Exterior Mirrors
  • Integrated Center Stack Radio
  • Integrated Voice Command W/Bluetooth
  • Manual Folding Exterior Mirrors
  • Normal Duty Suspension
  • Uconnect 5 Nav W/12.3" Display
  • USB Host Flip
  • 20" X 8.5" Machined/Painted Aluminum Wheels
  • Quick Order Package 2BE Limited
  • 2 12V DC Power Outlets and 1 Interior 120V AC Power Outlet
  • Altimeter
  • Aux Audio Input Jack
  • Brake Assist
  • CAPRI LEATHERETTE SEATS
  • Clock
  • Cushion Tilt and Power 4-Way Lumbar Support
  • Door Mirrors and Audio
  • Driver / Passenger And Rear Door Bins
  • Driver And Passenger Auxiliary Mirror
  • Engine Coolant Temp
  • Engine Hour Meter
  • Fore/Aft Movement
  • Front And Rear Vented Discs
  • Heated Wiper Park and Defroster
  • Height Adjusters and Pretensioners
  • Height Adjustment
  • Hill Hold Control and Electric Parking Brake
  • Illuminated Entry and Panic Button
  • Inclinometer
  • Mini Overhead Console w/Storage
  • Odometer
  • Oil Pressure
  • Oil Temperature
  • Piano Black Console Insert and Chrome/Metal-Look Interior Accents
  • Radio Data System and Uconnect External Memory Control
  • Simulated Wood/Metal-Look Door Panel Insert
  • Speed Compensated Volume Control
  • Steering Wheel Controls
  • Tachometer
  • Transmission Fluid Temp
  • Trip Odometer and Trip Computer
  • Visit DriveUconnect.com
  • Voice Activation
  • Voltmeter
  • "2.0L Hurricane 4 Turbo Engine w/ESS
  • 050 lbs GVWR
  • 10 Performance Speakers
  • 12-Way Power Driver Seat -inc: Power Recline
  • 12-Way Power Passenger Seat -inc: Power Recline
  • 1260# Maximum Payload
  • 12V power outlets 2 12V power outlets
  • 18"" x 8.0"" Polished/Painted Aluminum Wheels
  • 2 12V DC Power Outlets
  • 2 12V DC Power Outlets and 1 Interior 120V AC Power Outlet
  • 2 LCD Monitors In The Front
  • 2 Seatback Storage Pockets
  • 20"" X 8.5"" MACHINED/PAINTED ALUMINUM WHEELS
  • 23 Gal. Fuel Tank
  • 240 Amp Alternator
  • 265/50R20 BSW A/S LRR TIRES
  • 265/60R18 BSW A/S LRR Tires
  • 3-point seatbelt Rear seat center 3-point seatbelt
  • 4-Wheel Disc Brakes w/4-Wheel ABS
  • 4WD type Quadra-Trac I automatic full-time 4WD
  • 506w Regular Amplifier
  • 6
  • 60-40 Folding Split-Bench Front Facing Heated Manual Reclining Fold Forward Seatback Leatherette Rear Seat
  • 700CCA Maintenance-Free Battery w/Run Down Protection
  • ABS Brakes 4-wheel antilock (ABS) brakes
  • ABS Brakes Four channel ABS brakes
  • Accessory power Retained accessory power
  • Active Driving Assist System
  • Active Lane Management Lane Departure Warning
  • Active Lane Management Lane Keeping Assist
  • Adaptive cruise control Adaptive Cruise Control w/Stop & Go
  • Adaptive Cruise Control w/Stop & Go
  • Air conditioning Yes
  • Air Filtration
  • Airbag Occupancy Sensor
  • All-in-one key All-in-one remote fob and ignition key
  • Alternator Type Alternator
  • Altimeter
  • Aluminum Spare Wheel
  • Ambient lighting
  • Amplifier 506W amplifier
  • Antenna Integrated roof audio antenna
  • Armrests front center Front seat center armrest
  • Armrests front storage Front seat armrest storage
  • Armrests rear Rear seat center armrest
  • Auto door locks Auto-locking doors
  • Auto headlights Auto on/off headlight control
  • Auto high-beam headlights
  • Auto On/Off Reflector Led Low/High Beam Auto High-Beam Daytime Running Lights Preference Setting Headlamps w/Delay-Off
  • Automatic Full-Time Four-Wheel Drive
  • Autonomous cruise control Active Driving Assist System hands-on cruise control
  • Aux input jack Auxiliary input jack
  • Basic warranty 36 month/36 000 miles
  • Battery charge warning
  • Battery run down protection
  • Battery type Lead acid battery
  • Beverage holders Illuminated front beverage holders
  • Beverage holders rear Rear beverage holders
  • Black Bodyside Cladding and Black Fender Flares
  • Blind spot Blind Spot Detection
  • Blind Spot Detection Blind Spot
  • Body panels Galvanized steel/aluminum body panels with side impact beams
  • Body-Colored Door Handles
  • Body-Colored Front Bumper w/Black Rub Strip/Fascia Accent and Metal-Look Bumper Insert
  • Body-Colored Rear Bumper w/Black Rub Strip/Fascia Accent and Metal-Look Bumper Insert
  • Bodyside cladding Black bodyside cladding
  • Brake Actuated Limited Slip Differential
  • Brake assist system Predictive brake assist system
  • Brake type 4-wheel disc brakes
  • Bulb warning Bulb failure warning
  • Bumper insert Metal-look front and rear bumper inserts
  • Bumper rub strip front Black front bumper rub strip
  • Bumper rub strip rear Black rear bumper rub strip
  • Bumpers front Body-colored front bumper
  • Bumpers rear Body-colored rear bumper
  • Cabin air filter
  • Capless fuel filler
  • Cargo Area Concealed Storage
  • Cargo floor type Carpet cargo area floor
  • Cargo light Cargo area light
  • Cargo Space Lights
  • Cargo tie downs Cargo area tie downs
  • Carpet Floor Trim
  • Child door locks Manual rear child safety door locks
  • Chrome Gear Shifter Material
  • Chrome Grille
  • Climate control Automatic climate control
  • Clock Digital clock
  • Collision Mitigation-Front
  • Compact Spare Tire Mounted Inside Under Cargo
  • Compass
  • Compressor Intercooled turbo
  • Concealed cargo storage Cargo area concealed storage
  • Configurable instrumentation gauges
  • Connected Travel & Traffic Services Real-Time Traffic Display
  • Console insert material Piano black console insert
  • Corrosion perforation warranty 60 month/unlimited
  • Cross Path Detection
  • Cruise control Cruise control with steering wheel mounted controls
  • Cruise Control w/Steering Wheel Controls
  • Curtain 1st And 2nd Row Airbags
  • Cylinder head material Aluminum cylinder head
  • Day-Night Rearview Mirror
  • Day/Night rearview mirror
  • Deep Tinted Glass
  • Delay off headlights Delay-off headlights
  • Delayed Accessory Power
  • Digital Signal Processor
  • Digital signal processor Active Sound Enhancement digital signal processor
  • Digital/Analog Appearance
  • Distance alert Following distance alert
  • Door ajar warning Rear cargo area ajar warning
  • Door bins front Driver and passenger door bins
  • Door bins rear Rear door bins
  • Door handle material Body-colored door handles
  • Door locks Power door locks with 2 stage unlocking
  • Door mirror style Black door mirrors
  • Door mirror type Standard style side mirrors
  • Door mirrors Power door mirrors
  • Door panel insert Simulated wood and metal-look door panel insert
  • Door trim insert Vinyl door trim insert
  • Drive type Four-wheel drive
  • Driver And Passenger Heated Front Seat
  • Driver And Passenger Knee Airbag
  • Driver And Passenger Visor Vanity Mirrors w/Driver And Passenger Illumination
  • Driver foot rest
  • Driver information center
  • Driver lumbar Driver seat with 4-way power lumbar
  • Driver seat direction Driver seat with 8-way directional controls
  • Driver selectable steering effort
  • Drivetrain selectable Selec-Terrain driver selectable drivetrain mode
  • DRL preference setting
  • Dual Stage Driver And Passenger Front Airbags
  • Dual Stage Driver And Passenger Seat-Mounted Side Airbags
  • DUAL-PANE PANORAMIC SUNROOF"
  • Dual-zone front climate control
  • Eco Feedback ECO feedback display gauge
  • Electric Power-Assist Steering
  • Electronic parking brake
  • Electronic Stability Control (ESC) And Roll Stability Control (RSC)
  • Electronic stability control Electronic stability control system with anti-roll
  • Emergency Sos Capability
  • Emergency SOS Capable Vehicle integrated emergency SOS system
  • Emissions LEV3-SULEV30 emissions
  • Emissions tiers Tier 3 Bin 30 emissions
  • Engine Auto Stop-Start Feature
  • Engine block material Aluminum engine block
  • Engine Configuration Hurricane I4
  • Engine hour meter
  • Engine Hurricane 2L I-4 port/direct injection DOHC intercooled turbo regular unleaded engine with 324HP
  • Engine Location Front mounted engine
  • Engine Mounting direction Longitudinal mounted engine
  • Engine Short Hurricane 2L I-4 DOHC
  • Engine temperature warning
  • Engine/electric motor temperature gauge
  • External memory Uconnect external memory control
  • Fade-To-Off Interior Lighting
  • Fenders Black fender flares
  • First-row sunroof First and second-row sliding and tilting glass sunroof with express open/close activation sunshade
  • First-row windows Power first-row windows
  • Fixed Rear Window w/Wiper
  • Floor console Full floor console
  • Floor console storage Covered floor console storage
  • Floor coverage Full floor coverage
  • Floor covering Full carpet floor covering
  • Floor mats Carpet front and rear floor mats
  • FOB Controls -inc: Keyfob Cargo Access and Keyfob Remote Start
  • Fob engine controls Smart key with hands-free access and push button start
  • Fog lights LED front fog lights
  • Folding door mirrors Manual folding door mirrors
  • Folding rear seats 60-40 folding rear seats
  • For Details
  • Forward collision warning Full Speed Forward Collision Warning Plus
  • Front And Rear Anti-Roll Bars
  • Front And Rear Map Lights
  • Front anti-roll Front anti-roll bar
  • Front anti-whiplash head restraints Anti-whiplash front seat head restraints
  • Front Center Armrest w/Storage and Rear Center Armrest
  • Front cross traffic warning Intersection Collision Assist System front cross traffic mitigation
  • Front Fog Lamps
  • Front head restraint control Manual front seat head restraint control
  • Front head restraints Height and tilt adjustable front seat head restraints
  • Front impact airbag driver Driver front impact airbag
  • Front impact airbag passenger Passenger front impact airbag
  • Front passenger lumbar Front passenger seat with 4-way power lumbar
  • Front reading lights
  • Front seat upholstery Leatherette front seat upholstery
  • Front seatback upholstery Plastic front seatback upholstery
  • Front Seats w/Power 4-Way Driver Lumbar
  • Front side impact airbag driver Seat mounted side impact driver airbag
  • Front side impact airbag passenger Seat mounted side impact front passenger airbag
  • Fuel door lock Power fuel door lock
  • Fuel Type Regular unleaded
  • Full Carpet Floor Covering -inc: Carpet Front And Rear Floor Mats
  • Full Cloth Headliner
  • Full Floor Console w/Covered Storage
  • Full gauge cluster screen
  • Full Speed Forward Collision Warning Plus
  • Galvanized Steel/Aluminum Panels
  • Garage door opener
  • Garage Door Transmitter
  • Gas-Pressurized Shock Absorbers
  • Gauge cluster display size (inches) Gauge cluster display size: 10.25
  • Gauges -inc: Speedometer
  • Gearshifter material Chrome gear shifter material
  • Glove box Illuminated locking glove box
  • Grille style Chrome grille
  • Handsfree Uconnect w/Bluetooth handsfree wireless device connectivity
  • Headlight type Reflector headlights
  • Headlights LED low and high beam headlights
  • Headlights on reminder
  • Headlights-Automatic Highbeams
  • Headliner coverage Full headliner coverage
  • Headliner material Cloth headliner material
  • Heated door mirrors Heated driver and passenger side door mirrors
  • Heated front seats Heated driver and front passenger seats
  • Heated Leatherette Steering Wheel
  • Heated rear seats
  • Heated steering wheel
  • Heated wiper area Heated rear wiper park
  • Height adjustable seatbelts Front height adjustable seatbelts
  • High mount stop light High mounted center stop light
  • Hill start assist
  • HVAC -inc: Headliner/Pillar Ducts and Console Ducts
  • Ignition Spark ignition system
  • Ignition type Push-button
  • Illuminated entry
  • Illuminated Front Cupholder
  • Illuminated glove box
  • Illuminated Locking Glove Box
  • Immobilizer Sentry Key immobilizer
  • Inclinometer
  • Instrument Panel Covered Bin
  • Instrumentation display Digital/analog instrumentation display
  • Integrated navigation Integrated navigation system with voice activation
  • Integrated Navigation System w/Voice Activation
  • Integrated Roof Antenna
  • Interior 120V AC power outlets 1 interior 120V AC power outlet
  • Interior accents Chrome and metal-look interior accents
  • Interior courtesy lights Fade interior courtesy lights
  • Interior Trim -inc: Simulated Wood/Metal-Look Instrument Panel Insert
  • Internet access 4G LTE Wi-Fi Hot Spot mobile hotspot internet access
  • Internet radio capability
  • Intersection Collision Assist System
  • Jeep Connect Tracker System
  • Key in vehicle warning
  • Keyfob cargo controls Keyfob trunk control
  • Keyfob keyless entry
  • Keyfob remote start
  • Knee airbag Driver and passenger side knee airbag
  • Laminated Glass
  • Laminated window Laminated side window glass
  • Lane departure Active Lane Management
  • LED brake lights
  • LED Brakelights
  • License plate front bracket Front license plate bracket
  • Limited slip differential Brake Limited Differential brake actuated limited slip differential
  • Lip Spoiler
  • Lock-up transmission
  • Locking hub control Permanent locking hub control
  • Low level warnings Low level warning for coolant fuel washer fluid and brake fluid
  • Low tire pressure warning Tire specific low air pressure warning
  • Manual Anti-Whiplash w/Tilt Front Head Restraints and Fixed Rear Head Restraints
  • Manual Tilt/Telescoping Steering Column
  • Memory Settings -inc: Driver Seat
  • Memory settings Memory settings include: door mirrors and audio controls
  • Metal-Look Side Windows Trim and Metal-Look Rear Window Trim
  • Mobile app access Jeep Connect App mobile app access
  • Multi-Link Front Suspension w/Coil Springs
  • Multi-Link Rear Suspension w/Coil Springs
  • Multiple headlights Multiple enclosed headlights
  • Noise cancellation Active noise cancellation
  • Number of airbags 8 airbags
  • Number of beverage holders 8 beverage holders
  • Number of doors 4 doors
  • Number of first-row screens 2 total number of 1st row displays
  • Number of memory settings 2 memory settings
  • Occupancy sensor Airbag occupancy sensor
  • Oil pressure gauge
  • Oil pressure warning
  • Oil temperature gauge
  • One-touch down window Driver and passenger one-touch down windows
  • One-touch up window Driver and passenger one-touch up windows
  • Outboard Front Lap And Shoulder Safety Belts -inc: Rear Center 3 Point
  • Outside Temp Gauge
  • Over the air updates
  • Overdrive transmission
  • Overhead airbags Curtain first and second-row overhead airbags
  • Overhead console Mini overhead console
  • Overhead console storage
  • Paint Non-metallic paint
  • Panel insert Simulated wood and metal-look instrument panel insert
  • Parking sensors ParkSense with Stop rear parking sensors
  • ParkSense with Stop Rear Parking Sensors
  • ParkView Back-Up Camera
  • Passenger doors rear left Conventional left rear passenger door
  • Passenger doors rear right Conventional right rear passenger door
  • Passenger seat direction Front passenger seat with 8-way directional controls
  • Pedestrian detection Pedestrian/Cyclist Emergency Braking
  • Perimeter Alarm
  • Perimeter approach lighting Remote activated perimeter approach lighting
  • Perimeter/Approach Lights
  • Permanent Locking Hubs
  • Power 1st Row Windows w/Driver And Passenger 1-Touch Up/Down
  • Power Door Locks w/Autolock Feature
  • Power driver seat controls Driver seat power reclining lumbar support cushion tilt fore/aft control and height adjustable control
  • Power Fuel Flap Locking Type
  • Power Liftgate Rear Cargo Access
  • Power passenger seat controls Passenger seat power reclining lumbar support cushion tilt fore/aft control and height adjustable control
  • Power Rear Windows and Fixed 3rd Row Windows
  • Power Side Mirrors w/Turn Signal Indicator
  • Powertrain type ICE
  • Powertrain warranty 60 month/60 000 miles
  • Primary display size 12.3 inch primary display
  • Primary display touchscreen Primary monitor touchscreen
  • Proximity Key For Doors And Push Button Start
  • Quasi-Dual Stainless Steel Exhaust
  • Radiator
  • Radio AM/FM/digital/SiriusXM with 360Lsatellite
  • Radio w/Seek-Scan
  • RDS Radio data system (RDS)
  • Real time traffic Connected Travel & Traffic Services real-time traffic
  • Real time weather Connected Travel & Traffic Services real-time weather
  • Rear anti-roll Rear anti-roll bar
  • Rear camera ParkView rear mounted camera
  • Rear cargo door Power liftgate rear cargo door
  • Rear Child Safety Locks
  • Rear collision warning Cross Path Detection collision mitigation
  • Rear console climate control ducts
  • Rear Cupholder
  • Rear head restraint control 2 rear seat head restraints
  • Rear head restraints Fixed rear head restraints
  • Rear headliner/pillar ducts Rear headliner/pillar climate control ducts
  • Rear reading lights
  • Rear seat check warning Rear Seat Reminder rear seat check warning
  • Rear seat direction Front facing rear seat
  • Rear seat folding position Fold forward rear seatback
  • Rear seat upholstery Leatherette rear seat upholstery
  • Rear seatback upholstery Carpet rear seatback upholstery
  • Rear seats fixed or removable Fixed rear seats
  • Rear seats Split-bench rear seat
  • Rear Springs Regular grade rear springs
  • Rear window defroster
  • Rear window trim Metal-look rear window trim
  • Rear windshield Fixed rear windshield
  • Rear windshield wipers
  • Reclining rear seats Manual reclining rear seats
  • Redundant Digital Speedometer
  • Remote Keyless Entry w/Integrated Key Transmitter
  • Remote panic alarm
  • Roadside warranty 60 month/60 000 miles
  • Roof rails
  • Running lights LED daytime running lights
  • SAE Autonomy Level 2 - partial automation SAE Autonomy
  • Satellite trial 3 month satellite trial subscription
  • Seatback storage pockets 2 seatback storage pockets
  • Seatbelt pretensioners Front seatbelt pretensioners
  • Seatbelt pretensioners number 2 seatbelt pre-tensioners
  • Seating capacity 5
  • Second-row windows Power second-row windows
  • Security system
  • Seek scan
  • Selec-Terrain ABS And Driveline Traction Control
  • Selectable mode transmission Tow/Haul Mode selectable mode transmission
  • Selectable Terrain Modes
  • Sentry Key Immobilizer
  • Sequential shift control Sequential shift with steering wheel controls
  • Service interval warning Service interval indicator
  • Shock absorbers Gas-pressurized shock absorbers
  • Shutters Active grille shutters
  • Side Impact Beams
  • Smart device integration Android Auto/Apple CarPlay smart device wireless mirroring
  • Smart Device Remote Engine Start
  • Smart device remote start
  • Spare tire Compact spare tire with aluminum wheel
  • Spare tire location Spare tire mounted under the cargo floor
  • Speakers number 10 speakers
  • Speakers Performance grade speakers
  • Special paint Monotone paint
  • Speed Sensitive Variable Intermittent Wipers
  • Speed sensitive volume
  • Speed sensitive wipers
  • Speedometer Redundant digital speedometer
  • Split front seats Bucket front seats
  • Spoiler Rear lip spoiler
  • Springs front Front coil springs
  • Springs rear Rear coil springs
  • Start-stop engine Auto stop-start engine
  • Steering Electric power-assist steering system
  • Steering mounted audio control Steering wheel mounted audio controls
  • Steering type Rack-pinion steering
  • Steering wheel material Leatherette steering wheel
  • Steering wheel telescopic Manual telescopic steering wheel
  • Steering wheel tilt Manual tilting steering wheel
  • Streaming Audio
  • Suspension ride type front Independent front suspension
  • Suspension ride type rear Independent rear suspension
  • Suspension Standard ride suspension
  • Suspension type front Multi-link front suspension
  • Suspension type rear Multi-link rear suspension
  • Tachometer
  • Tailgate control Tailgate/power door lock
  • Tailgate/Rear Door Lock Included w/Power Door Locks
  • Tailpipe Stainless steel quasi-dual exhaust
  • Temperature display Exterior temperature display
  • Third-row windows Fixed third-row windows
  • Tinted windows Deep tinted windows
  • Tire pressure Tire Fill Alert programmable tire pressure fill assist
  • Tire Specific Low Tire Pressure Warning
  • Tires P265/50TR20 AS BSW front and rear tires
  • Towing Equipment -inc: Trailer Sway Control
  • Towing trailer sway Trailer sway control
  • Traction control Selec-Terrain all-speed ABS and driveline traction control
  • Traffic sign information Traffic Sign Recognition
  • Transmission electronic control
  • Transmission fluid temperature warning Transmission fluid temp warning
  • Transmission temperature gauge Transmission fluid temperature gauge
  • Transmission TorqueFlite 8-speed automatic
  • Transmission Type Automatic
  • Transmission w/Driver Selectable Mode and Sequential Shift Control w/Steering Wheel Controls
  • Trip computer
  • Trip odometer
  • Trunk hatch Trunk/hatch auto-latching
  • Trunk lid trim Plastic trunk lid trim
  • Trunk/Hatch Auto-Latch
  • Turn signal in door mirrors Turn signal indicator in door mirrors
  • Turn signal warning Turn signal on warning
  • Uconnect 5 Nav w/12.3"" Display
  • USB ports 10 USB ports
  • Valet Function
  • Valet key
  • Variable panel light Variable instrument panel light
  • Vehicle tracker Jeep Connect vehicle tracker
  • Ventilated brakes Front and rear ventilated disc brakes
  • Vinyl Door Trim Insert
  • Visor driver expandable coverage Driver visor with expandable coverage
  • Visor driver mirror Driver visor mirror
  • Visor illuminated driver mirror Illuminated driver visor mirror
  • Visor illuminated passenger mirror Illuminated passenger visor mirror
  • Visor passenger expandable coverage Passenger visor with expandable coverage
  • Visor passenger mirror Passenger visor mirror
  • Voice activated audio Voice activated audio controls
  • Voice activated climate control Voice-activated climate control
  • Voice Activated Dual Zone Front Automatic Air Conditioning
  • Voltmeter
  • Wheels 20 x 8.5-inch front and rear machined w/painted accents aluminum wheels
  • Window Trim Metal-look side window trim
  • Wipers Variable intermittent front windshield wipers
  • Wireless streaming Bluetooth wireless audio streaming

Test Drive
Apply for Financing
Request More Info

Similar Vehicles

Disclaimer

*The advertised price does not include sales tax, vehicle registration fees/DMV, other fees required by law, finance charges and any documentation charges. Images, pricing and options shown are examples, only, and may not reflect exact vehicle color, trim, options, pricing or other specifications

*For Leases: Lessee responsible for maintenance and all excess wear/tear. Leasing &/or Financing: All offers subject to approval by primary lender.

*Not responsible for typographical errors or program allowance changes prior to publication.

*In stock vehicle only for applicable promotion. Chrysler, Jeep Dodge & Ram are registered trademarks of FCA US LLC.

*MSRP is the Manufacturer's Suggested Retail Price (MSRP) of the vehicle. It does not include any taxes, fees or other charges. Consult your dealer for actual price and complete details. Vehicles shown may have optional equipment at additional cost.

*The estimated selling price that appears after calculating dealer offers is for informational purposes, only. You may not qualify for the offers, incentives or financing. Offers, incentives or financing are subject to expiration and other restrictions. See dealer for qualifications and complete details.

*Images, prices, and options shown, including vehicle color, trim, options and other specifications are subject to availability, incentive offerings and credit worthiness.

*In transit means that vehicles have been built, but have not yet arrived at your dealer. Images shown may not necessarily represent identical vehicles in transit to your dealership. See your dealer for payments and complete details. "Dealer Discount" & "Special Discount" Only Applicable with Dealer Financing. See Dealer For Details/Limitations/Restrictions

*Manufacturer’s Rebate subject to residency restrictions. Any customer not meeting the residency restrictions will receive a dealer discount in the same amount of the manufacturer’s rebate.

For VIN specific payload/towing:
Max payload/towing estimate ratings shown. Additional options, equipment, passengers, and cargo weight may affect payload/towing weights. See dealer for details.

New 2026 Jeep Grand Cherokee Limited 4x4

New Vehicles for Sale near Bayside NY

If you’re on the hunt for reliable, stylish, and powerful vehicles, look no further than Bayside Chrysler Dodge Jeep Ram (CDJR). Our huge inventory is packed with dependable SUVs ready for off-roading, tough trucks, and family-friendly vehicles. Explore new vehicles for sale near Bayside, New York, with us and start your journey to owning a car that excites every mile of your drive.

Explore the CDJR Lineup

The CDJR lineup is crafted to offer something for everyone. Jeep models like the Wrangler and the Grand Cherokee are legendary for their off-road capability and refined comfort, perfect for Bayside drivers who love weekend getaways or daily urban driving.

Dodge offers muscle and speed with models like the Charger and the Challenger, blending raw power with modern tech to keep you connected and safe. Ram trucks are built tough, combining impressive towing capabilities with luxurious interiors, and are ideal for both work and play. Chrysler rounds out the group with sophisticated sedans and minivans, providing advanced safety features and designed for comfort.

Each CDJR vehicle is engineered with technology that helps keep you safe and entertained, including Uconnect® infotainment systems, advanced driver-assist features, and fuel-efficient engine options. The lineup also includes hybrid and electric variants, reflecting the brand’s commitment to innovation and sustainability. According to Edmunds, Jeep and Ram vehicles consistently rank high in owner satisfaction for their reliability and performance, making them wise choices for long-term ownership. *

Explore New Vehicles Online

While we invite you to visit our Bayside, NY, dealership to experience our vehicles firsthand, our online inventory page makes browsing easy and convenient from the comfort of your home. You can filter cars by model, price, features, fuel type, and more, helping you zero in on the perfect car in your own time. Detailed photos, videos, and full specs accompany each listing, giving you a comprehensive view of what each vehicle offers.

Our website’s intuitive design allows you to compare vehicles side by side, check availability in real-time, and even schedule a test drive online. This seamless digital experience saves you time and empowers you to make informed decisions.

Financing Made Simple: Drive Your Dream Vehicle Today

Financing your next CDJR vehicle is designed to be smooth and straightforward. Our knowledgeable finance team partners with trusted lenders to offer competitive loan and lease options tailored specifically to your credit situation and budget.

Leasing can provide lower monthly payments and more flexibility, while purchasing allows you to build equity in your new vehicle. Our experts help you understand both benefits so that you can choose the best option for your lifestyle.

Plus, with convenient online tools like a payment calculator and online finance application, planning your budget for new vehicles for sale in Bayside, NY, is straightforward.

FAQs About CDJR Model Features

  • Which safety features are standard in CDJR vehicles?

CDJR models have advanced safety technology, such as adaptive cruise control, blind-spot monitoring, and automatic emergency braking. Many models also include multiple airbags and reinforced frames, ensuring protection in all driving conditions.

  • Can I find fuel-efficient options in the CDJR lineup?

Absolutely. The lineup includes fuel-efficient engines and hybrid options, like the Jeep 4xe plug-in hybrid models, combining power with eco-conscious driving. This helps save on fuel costs and reduces your environmental footprint.

  • How user-friendly is the infotainment system?

Most CDJR vehicles feature the award-winning Uconnect® system, known for its intuitive touchscreen, smartphone integration via Apple CarPlay® and Android Auto™, and voice command capabilities. It keeps you connected and entertained with minimal distractions.

These features highlight why CDJR vehicles continue to win praise for blending performance, comfort, and technology.

Ready to Find Your Perfect Vehicle? Contact Us!

Find a huge collection of vehicles for sale in Bayside, New York, at Bayside CDJR. With our expert financing options and a smooth buying process, getting behind the wheel of your dream vehicle is easy. Contact us!

*https://www.edmunds.com/jeep/

Click to call sales

While great effort is made to ensure the accuracy of the information on this site, errors can occur. Please verify all pricing and installed equipment information with a customer service representative. This is easily done by calling us or visiting us at the dealership.

Customer may not qualify for ALL Rebates shown. Some rebates are stackable and others can and cannot be combined. See Dealer For Complete Details.

We improve our products and advertising by using Microsoft Clarity to see how you use our website. By using our site, you agree that we and Microsoft can collect and use this data. Our privacy statement has more details.